注册 登录  
 加关注
   显示下一条  |  关闭
温馨提示!由于新浪微博认证机制调整,您的新浪微博帐号绑定已过期,请重新绑定!立即重新绑定新浪微博》  |  关闭

向阳英语教育的博客

热忱欢迎广大学子及英语爱好者咨询交流,有意者可加QQ965920830

 
 
 

日志

 
 
关于我

三尺讲台是我的T台。选择了就不后悔,在与教育流氓叫板的呐喊声中像自己手中的粉笔一样,给孩子们描绘美好的未来,自己变成微不足道的粉末。

网易考拉推荐

Sichuan-Tibet Highway marks 60 years  

2014-11-06 20:45:34|  分类: 默认分类 |  标签: |举报 |字号 订阅

  下载LOFTER 我的照片书  |

Reporters from ten Chinese mainland and Hong Kong websites gathered in Southwest China city Chengdu on Nov.6  and will soon embark on a journey to Lhasa in Tibet on Sichuan-Tibet Highway, reporting on livelihoods in cities and towns along the route and surveying possible benefits the overland road has brought to local people.

The reporters have been invited by The United Front Work Department of CPC Central Committee. This year marks the 60th anniversary of the completion of Sichuan-Tibet Highway and its opening to traffic in December 1954.

It also marks the 60th anniversary of Qinghai-Tibet Highway's being put into operation. Another group of journalists will start a tour on Qinghai-Tibet Highway from Xining of Qinghai province to Lhasa beginning Sunday.

The reporters on the Sichuan-Tibet Highway trip will visitYa'an, Kangding and Ganzi Tibetan autonomous prefecture of Sichuan province and Dege, Jiangda, Changduand Lahsa of Tibet autonomous region, covering sections in both the North Line and the South Line of the highway in a journey of more than 2,000 kilometers.

Sichuan-Tibet Highwayconsists of two lines with its South Line linkingYa'an, Kangding, and Tongolo of Sichuan province and Mangkang, Zuogong, and Nyingchi of Tibet autonomous region to Lhasa.

The South Line has a length of 2,115 kilometers and is a part of No 318 State Highway, which starts from Shanghai Hongqiao International Airport in the east to the Zhangmu Port of Tibet Autonomous Region China-Nepal Highway in the west.

The North Line, with a full length of 2,414 kilometers, overlaps with South Line at the section from Chengdu to Tongolo, goes north after separating from South Line at Tongolo, overlaps with it at Bangda after Qianning, Ganzi, Dege, Jiangda in Tibet Autonomous Region, and finally leads to Lhasa.

Construction of the highway started in April 1950 and is the first highway to link Chengdu, Sichuan province with Lhasa, Tibet autonomous region.

The whole project involved 110,000 builders made up of soldiers and local residents. More than 2,000 builders died finishing the line, which winds through 21 mountains over 4,000 meters high and crosses 14 major Southwest China rivers, including Nujiang and Jinshajiang, according to Sichuan Transport Bureau. The road reaches its highest point at a 5,050 meters altitude.

  评论这张
 
阅读(47)| 评论(1)
推荐 转载

历史上的今天

在LOFTER的更多文章

评论

<#--最新日志,群博日志--> <#--推荐日志--> <#--引用记录--> <#--博主推荐--> <#--随机阅读--> <#--首页推荐--> <#--历史上的今天--> <#--被推荐日志--> <#--上一篇,下一篇--> <#-- 热度 --> <#-- 网易新闻广告 --> <#--右边模块结构--> <#--评论模块结构--> <#--引用模块结构--> <#--博主发起的投票-->
 
 
 
 
 
 
 
 
 
 
 
 
 
 

页脚

网易公司版权所有 ©1997-2017